Skip to product information
1 of 6

Fablosslashes

Lash Tweezers For Eyelash Extensions Fiber Tip Lash Tweezer Precision Professional Craft Tweezer, Japanese Steel (Black S-Curved Tweezer)

Lash Tweezers For Eyelash Extensions Fiber Tip Lash Tweezer Precision Professional Craft Tweezer, Japanese Steel (Black S-Curved Tweezer)

Regular price $17.99 USD
Regular price $17.99 USD Sale price
Shipping calculated at checkout.

Overview

  • Brand : Fablosslashes
  • Material : Stainless Steel
  • Color : Black
  • Product Dimensions : 4.7"L x 0.7"W
  • Style : Black S-Curved Tweezers

About this item

  • Ultra-Precise Fiber Tip Design: Suitable for all professional lash artists, our set of fiber tip lash tweezers all have amazing gripping power, you will get unprecedented precision and professionalism
  • Premium Stainless Steel: The exterior of this lash cluster tweezers is coated with plasma coating, which won't come off; the interior is made of high quality stainless steel, which is sturdy and waterproof, which makes it a luxurious piece of craftsmanship
  • Professional Lash Tweezers For Eyelash Clusters: Our fine point tweezers tweezers for fan lash extensions, isolation lashes, curling lashes, and more, are lighter in weight and have a finer tip so you can enjoy optimal control
  • Tweezers For Crafting: Made of 100% hand polished. There will be no bending, misalignment or dulling. The outer layer is designed with an embossed shape for less effort. The tip is fully closed and will not make lashes easily spread out
  • Impressive: This fiber tip lash tweezers can meet all your eyelash extension requirements, the high-end design and minimalist color complements your unique style, it will surely impress your clients, please don't hesitate to buy it
View full details
  • ⭐️⭐️⭐️⭐️⭐️

    β€œI love that Elysoria is cruelty-free and eco-conscious. It’s so refreshing to find a brand that truly cares β€” for my skin and the planet.”

    β€”Clara D.

  • ⭐️⭐️⭐️⭐️⭐️

    β€œI noticed a difference after just a few uses! My face looks brighter, and my confidence has never been higher. Thank you, Elysoria!”

    β€”
    Samant

  • ⭐️⭐️⭐️⭐️⭐️

    β€œThe packaging, the scent, the results β€” everything about Elysoria feels like a spa experience at home. My skin absolutely loves it.”

    β€”
    Mikaela R.